Harga Mesin (Januari 2018)

No Jenis Mesin Kapasitas Harga Sewa / 8 jam Keterangan
1 Beton Molen 1.0 M3 / jam & Vol. drum 350 liter 175.000 1 Zak PC (125 Lt Beton – 1:2:3)
2 Compressor Listrik 1 Breaker / Jack Hammer 375.000 Swan 20 KVA
3 Cutter Beton 375.000 Beton & Aspal (Tanpa Pisau)
4 Cutter Beton 775.000 Beton & Aspal (Termasuk Pisau)
5 Generator 2.400 Watt 150.000 110/220 V 1 Phase 2.4 KVA
6 Generator 15.000 Watt 225.000 220/380 V 1 & 3 Phase 15 KVA
7 Generator (Silent) 40.000 Watt 600.000 220/380 V 3 Phase 40 KVA
8 Generator (Silent) 50.000 Watt 775.000 220/380 V 3 Phase 50 KVA
9 Generator (Silent) 80.000 Watt 1.100.000 220/380 V 3 Phase 80 KVA
10 Generator (Silent) 150.000 Watt 1.900.000 220/380 V 3 Phase 150 KVA
11 Jack Hammer Listrik Kecil 220V 200.000 BOSCH 1.050 Watt 1 Phase
12 Jack Hammer Listrik Sedang 220V 225.000 BOSCH 1.300 Watt 1 Phase
13 Jack Hammer Listrik Besar 220V 350.000 BOSCH 1.800 Watt 1 Phase
14 Las Listrik Diesel 3.2 mm 200.000 Duty Cycl. / 250A / TS 155
15 OHM Saklar + Kabel 50 meter 175.000 Kelengkapan Genset 15 KVA
16 OHM Saklar + Kabel 50 meter 275.000 Kelengkapan Genset 50 / 80 KVA
17 OHM Saklar + Kabel 50 meter 350.000 Kelengkapan Genset 150 KVA
18 Pompa Air (Listrik) 9 meter / Submarsible 150.000 Dia 2* – 250 Lt / Mnt 1 Phase
19 Stoom 1.0 – 2.9 ton 200.000
20 Stamper (Timbris Kodok) 5 ton / 200 m3 / 8 jam 200.000 Pasir, split, aspal
21 Stamper (Timbris Tanah) 5 ton / 200 m3 / 8 jam 200.000 Tanah Brangkal
22 Tripod 125.000 Panjang pipa 3 & 5 meter
23 Trafo Las 150.000 220/280 V 1 & 3 Phase 2 – 5 KVA
24 Trowel Perata Beton 275.000
25 Vibrator 5 PK 175.000