No |
Jenis Mesin |
Kapasitas |
Harga Sewa / 8 jam |
Keterangan |
1 |
Beton Molen |
1.0 M3 / jam & Vol. drum 350 liter |
175.000 |
1 Zak PC (125 Lt Beton – 1:2:3) |
2 |
Compressor Listrik |
1 Breaker / Jack Hammer |
375.000 |
Swan 20 KVA |
3 |
Cutter Beton |
|
375.000 |
Beton & Aspal (Tanpa Pisau) |
4 |
Cutter Beton |
|
775.000 |
Beton & Aspal (Termasuk Pisau) |
5 |
Generator |
2.400 Watt |
150.000 |
110/220 V 1 Phase 2.4 KVA |
6 |
Generator |
15.000 Watt |
225.000 |
220/380 V 1 & 3 Phase 15 KVA |
7 |
Generator (Silent) |
40.000 Watt |
600.000 |
220/380 V 3 Phase 40 KVA |
8 |
Generator (Silent) |
50.000 Watt |
775.000 |
220/380 V 3 Phase 50 KVA |
9 |
Generator (Silent) |
80.000 Watt |
1.100.000 |
220/380 V 3 Phase 80 KVA |
10 |
Generator (Silent) |
150.000 Watt |
1.900.000 |
220/380 V 3 Phase 150 KVA |
11 |
Jack Hammer Listrik Kecil |
220V |
200.000 |
BOSCH 1.050 Watt 1 Phase |
12 |
Jack Hammer Listrik Sedang |
220V |
225.000 |
BOSCH 1.300 Watt 1 Phase |
13 |
Jack Hammer Listrik Besar |
220V |
350.000 |
BOSCH 1.800 Watt 1 Phase |
14 |
Las Listrik Diesel |
3.2 mm |
200.000 |
Duty Cycl. / 250A / TS 155 |
15 |
OHM Saklar + Kabel |
50 meter |
175.000 |
Kelengkapan Genset 15 KVA |
16 |
OHM Saklar + Kabel |
50 meter |
275.000 |
Kelengkapan Genset 50 / 80 KVA |
17 |
OHM Saklar + Kabel |
50 meter |
350.000 |
Kelengkapan Genset 150 KVA |
18 |
Pompa Air (Listrik) |
9 meter / Submarsible |
150.000 |
Dia 2* – 250 Lt / Mnt 1 Phase |
19 |
Stoom |
1.0 – 2.9 ton |
200.000 |
|
20 |
Stamper (Timbris Kodok) |
5 ton / 200 m3 / 8 jam |
200.000 |
Pasir, split, aspal |
21 |
Stamper (Timbris Tanah) |
5 ton / 200 m3 / 8 jam |
200.000 |
Tanah Brangkal |
22 |
Tripod |
|
125.000 |
Panjang pipa 3 & 5 meter |
23 |
Trafo Las |
|
150.000 |
220/280 V 1 & 3 Phase 2 – 5 KVA |
24 |
Trowel Perata Beton |
|
275.000 |
|
25 |
Vibrator 5 PK |
|
175.000 |
|